Saturday, August 27, 2011

Rose Trellis Shawl

It is knit, blocked and photographed. In the end, I did not have enough yarn in the end for an elaborate edging so I did a simple garter st border with a (k2tog, yo) row in the middle, for both ends. It turned out quite respectably proportioned at 27 X 81 inches, blocked. I am very happy with it, looks prettier than I had hoped. Now, on to look for a new project.

Wednesday, August 17, 2011

Shawl In Progress

As I mentioned in a previous post, I opted to resume knitting the Rose Trellis Shawl during Ramadan, to keep me from starting any new projects (that has been mostly successful, except for a pair of baby sandals :)).
 
Knitting lace has been my way of winding down after a long day. I work on it after the kids are in bed and Isha and taraweeh prayers are said. I am happy to report that I am now at the last section of the shawl. If I have enough yarn, I might add an edging at each end to lengthen the shawl.

Monday, August 1, 2011

Ramadan Mubarak

Ramadan moon has been sighted here in Pakistan. This year finds me a little ill prepared for this holy month-  what with a new baby (who is currently running a post vaccination fever), a bit messy house, inadequate pantry and all. But I still feel more motivated to make the best of this blessed month, than last year, inshaAllah. Meanwhile, I won't be posting much as the crafts take a backseat.
May Allah make this blessed month beneficial for us all!