Monday, October 26, 2009

Floral Slippers


Changing weather and my cold feet prompted a quick project_ a pair of slippers. I designed them myself, getting the right fit on the second attempt. The flower is worked in intarsia though I think duplicate st could have worked as well.
The yarn is the left over from spiderman afghan and needle size 4 mm. These turned out to be a great, snug fit and make my feet warm and happy.

Monday, October 19, 2009

Spartan Pullover in Progress

My newest WIP is Spartan pullover and I am knitting it for my husband. It is a very basic design with drop shoulders and a fair-isle band at the waist. At the moment I have gotten just past the band.

From now on, it is going to be pretty straight forward and probably boring. However, I am hoping to get it done by the end of this month, inshaAllah.

Tuesday, October 13, 2009

Spiderman Afghan

It is finally done. I kept going until I ran out of red and blue yarn. It is good-sized at 62 inches diameter even though I could not put as many color repeats as I had originally planned. The pattern goes quite fast and I enjoyed it enormously. I did many modifications, like using a larger hook, different color sequence and slightly different way of doing the ribbing. I started with black yarn instead of red, so the ribbing ends at the edge of that central black circle and there is no bunching at the center. My son is very happy with his afghan and the weather has turned just right for it to be useful!

Friday, October 2, 2009

Superhero Dreamcatcher

Nobody might like spiders but kids sure do love spiderman and my son is no exception. I had promised my son a spiderman afghan for a long time and with the winter drawing closer (or is it?? It's so very hot here!!), I have started working on it.

I am using this pattern but changing the color sequence a bit and using 5.5mm hook instead of recommended 5 mm one. It is working up quite fast even though I had to frog twice because I failed to correctly read a pattern line. However, crochet is hard on my wrists and I have to take frequent breaks. (With knitting, it is mainly my shoulders which bear the brunt).
The kids of course are pretty excited about this project, pulling it up to measure against themselves to see how it has "grown".

Wednesday, September 30, 2009

Cotton Pullover


After a few days of post-holiday fatigue, I resumed work on the cotton pullover that I was knitting for my son. Finally finished it today. As the body and sleeves were knit in rounds, there were only raglan seams to sew but quite a few ends to weave in and then of course the pocket seam and band. This project used up less than two balls each of Cotton Ease Violet and Lime and I used 4 mm and 5mm needles.

I am pleased to see that it fits rather well and my son also seems to like it. His indifference turned to warmth and eagerness when I reminded him of his favorite cartoon hero who wears somewhat similar looking jacket :D

Monday, September 28, 2009

Sunburst Coat Is Up

After being test knitted, Sunburst Coat finally goes up for sale at my ravelry store. Non-ravelry people can find the purchase link on blog's side bar.
This is a top-down seamless coat for sizes 2- 12 years.
: Aran / 10 ply (8 wpi)
: 15.5 stitches and 22 rows = 4 inches in st st on 5mm needles
: US 6 - 4.0 mm, US 8 - 5.0 mm
: 550 - 1300 yards (503 - 1189 m)
:  2 (4, 6, 8, 10, 12) years
Finished measurements:
Chest: 24 (26, 28, 30, 32,34) inches
Length: 16 (18.5, 21, 23.5, 26, 28.5) inches
Armhole depth: 5 (5.5, 6, 6.5, 7, 7.5) inches
Sleeve length (to underarm): 8.5 (10.5, 11.5, 12.5, 13.5,15) inches

Tuesday, September 22, 2009

Eid Mubarak

Eid as always started with chand raat (the eve of Eid). Moon was sighted early in the evening so we could get busy with our henna and bangles.

For once the kids were excited about their bedtime as it mean time for henna, LOL. As you can see, car was a popular theme with them.

My henna design flopped this year as I was unoriginal and tried to copy a pattern out of our living room rug onto my hand.
The Eid day started bright and early with the father-son duo going for Eid prayers.

And after that we were ready to receive and visit family and friends.
The kids had a happy and fun-filled Eid, going to bed exhausted around midnight. And we still have two more days of the same! Hope everyone had a wonderful time!