Pages

Friday, January 1, 2016

Dreams Of Aran Pullover

 
Three weeks ago, I made a tall claim of getting this sweater done in a week. But seasonal illnesses took most of December away from me and I was only able to really knit during the last week.
 Still, I cannot help but be thrilled about being able to post a FO (finished object) on the first day of the new year. Especially, since it means that I have finally finished a project that I started in October 2014, and that I was mostly successful in getting it done by the end of December (It was all done except the neckband).
You can tell by the length of time it was on the needles, that it was not an easy project. Like all knitting project for men, it took too long to grow. The cables slowed the knitting even further. Then I ran out of yarn, with both sleeves to go, and could not find the color in the same yarn wight. So after much misgiving, I knit the sleeves with two strands of much thinner yarn, held together, and am happy to report that the difference between two yarns is barely noticeable.
 
The pattern, like most DROPS patterns, was a bit difficult to decipher at places, but was well-worth the effort. In the end, I am totally pleased with the sweater and the fact that it got done in time for my son to wear during the winter season. My son rates it an eight out of ten, which is not bad at all, considering he compares it to his Neville sweater, which is totally awesome.


1 comment:

  1. That is absolutely gorgeous, and looks fantastic on your lucky son! Congrats on the finish - always pleasing to get a sidetracked project done and off the needles, but it this case, with such a beautiful result, you must be especially delighted! Great start to 2016 :)

    ReplyDelete